Posts Tagged ‘insulation’

what’s in your walls?

Wednesday, June 8th, 2011

So back to the downstairs, which is now in motion. David will tell you what he’s up to…

—————————————————————————————————-

One of the aims of these renovations is to cut our energy use, ideally by 60% or better. How will we achieve that lofty goal? By making the house air-tight and by adding insulation. Lots of insulation.

We ordered 3” of EPS (fancy name for styrofoam) made right here in Rhode Island by Branch River Plastics. Not only did it not have to ship from China, they make their foam in any size you like and they put boric acid in it to keep insects out  — which is handy seeing as we discovered there used to be termites in the walls. It weighs 2 pounds per cubic foot, so it’s denser than the shipping foam you’re used to. It is made with air instead of HCFCs so it’s better for the environment and holds its R-value over time unlike most other rigid foam insulation that slowly loses its effectiveness.

PL-300 adhesive holds it in place without dissolving it, don’t use anything that isn’t labelled specifically for foam…

foam glue

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We had them cut pieces to fit between the floor joists…

rim joist foam

I wrapped it around the short walls on either end of the main space…

short wall before

short wall during

The wood-framed walls on top of the foundation receive two layers of un-faced fiberglass, here’s the first…

short wall after

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

When it’s done, the bathroom should be warm and cozy…

bath wall foam

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I ran beads of the foam glue between the pieces to make them one big layer…

foam glue 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Special tape seals the deal…

foam tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I’ll be adding 3/4” furring strips screwed to the concrete. They’ll give us something to attach the sheetrock to, create a bit of air space to allow moisture to get out and give the electrician a place to run his wires. All that coming soon!

 

worth the wait

Thursday, May 19th, 2011

space in waiting

I mentioned the other day that not much sawdust has been made downstairs while we’ve been awaiting input from an expert. David now explains why the short delay is going to pay off…

—————————————————————

Although our house is a simple shape on the exterior, the construction details make modifying it on the interior rather difficult. We’ve needed planning help along the way from architects, structural engineers, plumbers, electricians and now an energy expert.

So Paul Eldrenkamp, our ‘house scientist’, came by Monday morning and we got down to the nitty gritty of what goes on top of what, how do we keep energy where we want it and how do we keep water out of where we don’t. Paul is the owner of Byggmeister, a Newton, MA-based firm that specializes in designing and building sustainable, environmentally responsible homes.

Paul is what you’d call wicked smaht in our neck of the woods. He’s one of only 14 passive house consultants in the country — and the only one in New England. He brings 28 years of experience to our project, so we were lucky to find him and convince him to help us.

Paul has come up with a plan to heat and cool our house comfortably but economically — even integrating the wood stove we want. He’s figured out how to insulate the house to a reasonably high level, seal the house against air leaks and maintain healthy air quality.

As in many endeavours, doing a 95% job on insulation can result in only a 30% increase in effectiveness. A couple of loose or missing pieces of the puzzle can negate some or all of the benefits achieved elsewhere. This is also true of air-sealing a house. The details that we came up with on Monday and Paul’s continuing support will get us where we’d like to end up.

Yesterday I ordered the insulating foam board that will be the first step in putting the downstairs back together. I’ll post the details as I go.