Posts Tagged ‘patio’

pond action

Monday, April 25th, 2011

Yep, it’s happening. The pond is finally coming together. Yay! On Friday, the thermal blankets came off and the intake pipe for the skimmer went in. First, the cinder block wall had to be cut…

cutting the wall to make a notch for the intake

Then the pipe got cemented in and left to harden up over the weekend…

the intake to the skimmer gets cemented into place

Today, more cement went in. This baby’s not going anywhere…

more cement

Eventually that pipe will connect to the pond filter and pump. More on that when I have something to show you.

With specifications from the engineer, RI Welding was able to make the steel supports that will hold the two bridges across the pond. In case you’re wondering, yes, that’s a 1/4″ wall of Type 304 stainless steel (whatever that means)…

the steel arrives

This afternoon we decided on the placement of the bridges…

the steel bridge supports get placed

After much noise and cement dust, the walls were notched to hold the steel in place…

the steel supports get their own special notch

Tomorrow, the flexible pond liner will go down with the steel supports right on top of it. With the steel in, you have a pretty good idea of what it’s going to look like when it’s finished…

a hint of pond to come

I wonder if we’ll have a pond and patio ready for celebrating Cinco de Mayo? Probably too much to hope for. But I’ll keep some limes handy anyway. You know, just in case.

snow day!

Monday, December 27th, 2010

Hope you had an excellent holiday. It’s finally looking festive here. The first and likely last blizzard of the season arrived last night. The forecast said 21″ but we only got 12″. 50 mile an hour winds left us with bare spots and crazy 4′ drifts…

winter wonderland + construction zone = watch out!

Oh, in case you were wondering: yes, a foot of snow on top of the slippery, polypropylene thermal blankets on our construction zone makes for hazardous footing. The good news is that even though the patios are on hold until spring, we found an excellent use for the pond in the meantime…

pond of snow

Snow tunnels!

pond of snow

Hope you’re out there having fun, too!

snowy wreath

if only…

Tuesday, December 14th, 2010

Something occurs to me as I look out over the yard of almost shins-deep, rapidly hardening mud…

wasteland 1

wasteland 2

wasteland 3

Had we chosen the Circle Up landscape layout from among our many choices, the pond and patios would probably be done now. Probably. Maybe. Smaller pond means less digging. Less digging would probably have meant fewer sacrificed plants and less brand-new topsoil carted away — both of which will have to be replaced. Now we can look forward to fabulously mucky, slippery journeys up and down the slope after every snow and rain shower, all winter long. Oh joy.

Curse you, hindsight. Curse you.

patios: day 6

Monday, December 6th, 2010

brrrrrrrrrrrrrrrrrrrrrrrrrrr!!! 23 degrees this morning and it barely reached freezing today. Brisk wind didn’t make it any warmer, that’s for sure. Still, the Land Design Associates crew was here at 8 a.m. with their woolies on.

With temps this low, they couldn’t do anything involving concrete. Installing the flexible pond liner is a no go too as apparently it gets brittle below freezing. That made it a clean-up day instead.

Fill went in around the backside of the pond walls…

day 6 backfill

The floor of the pond was raised up some with base, raked to level, tamped down…

day 6 boys at work

day 6 eod

Piles of soil were leveled out and the yard was graded back to something manageable. Then the pond and patio area were covered in thermal blankets again to keep the ground pliable…

day 6 thermal blankets

The stone pavers can’t go onto the patio until the pond liner is in and the coping around the edge of the pond is installed. Soooooo… looks like we’ll have a wait for the temps to rise before much more can be done up top. There is, however, a chance the lower patio may go in tomorrow.

Shall we  consult the Magic Eight Ball to see what it has to say about that?

——————————

Day 5

Day 4

Day 3

Day 2

Day 1

patios: day 5

Sunday, December 5th, 2010

So our patio project is really hardening up. heh heh. See all that cement?

day 5 cement

It’s now in our backyard. Day 5 was all about finishing the walls of the koi pond. That entailed a lot of cement…

day 5 cement day

And a lot of ensuring that lines were squared up and things were level…

day 5 getting the walls level

And a lot of yard guts being moved out of the way and into the street…

day 5 yard guts

What does that mean for the plants in the margins of the yard?

day 5 poor cardoons

Let’s just say I’ll be digging out the cardoons and the euphorbias and yadayadayada.

It never made it out of the low 40s today. Brrrrrrrrr. But in spite of the cold those boys powered through the walls. Look at them go!

day 5 what a difference a day makes!

day 5 view from the corner

With the temps dropping down into the 20s at night, the crew decided to break out the thermal blankets on the newly poured walls and upper patio area…

day 5 thermal blankets

As well as the lower patio…

day 5 lower thermal blankets

That was a long Saturday’s worth of progress. Nothing going on here on Sunday. Except more hardening. And maybe I’ll get out there with a shovel to see if I can find my poor plants. Sorry plants!

————————

Day 4

Day 3

Day 2

Day 1

patios: day 4

Friday, December 3rd, 2010

I swear we’re not building a pyramid. Really. Even though our full driveway says otherwise. No room for cars here. It’s full of sand. Cement block. Cement block. Cement block…

day 4 driveway full

Oh, and the granite strips that will eventually create the border of the pond…

day 4 stone strips

This morning the Land Design Associates boys started forming the walls of the pond. Those cement blocks were leveled and stacked and leveled and stacked, etc. Rebar pounded into place…

day 4 building walls

Remember how they’re out there designing The Island of Patio? Might help to look at the layout again. The pond wraps around two sides of the patio, with steps across the koi pond on both sides…

the winner!

So they started digging the top part of the L today…

day 4 digging the other side

Now you can really begin to understand why I’m calling this The Island of Patio…

day 4 one big L

Easier to see what it’s going to look like it you view it from the outside edge…

day 4 patio as island

Island! Cue the Hawaiian music. Easy to see why they’re going to need all those cement blocks, eh?

day 4 more walls

At the rate they’re whipping through this project, this thing might be done next week. omg, a project that might actually be done! Hard to imagine. It hurts my head. Ouch.

————————

Day 3

Day 2

Day 1

patios: day 3

Thursday, December 2nd, 2010

The Land Design Associates crew was hard at work making the magic happen out there today. A quick rundown…

The 5′-long granite steps got hauled up the hill and readied for installation…

day 3 first step comes up the slope

Some trimming. Some pounding. And voila! We have a step…

day 3 steps goes in

18″ deep to match the width of the stone pavers that will soon go in. It’s gonna be a little crazy having an actual step instead of the tree stump we’ve been using…

day 3 closeup on steps

Minimal. I dig it. Can you picture it with our future wall of glass? Looks good, right?

day 3 steps from a distance

Further down the hill, the crew marked out the lower patio and prepped it for pavers…

day 3 lower patio prepped

Back up top, the big patio had more base material added and tamped down…

day 3 more patio prep up top

A massive load of concrete blocks arrived. These will eventually form the walls of the pond. Don’t worry, they’ll be hidden by the rubber pond liner…

day 3 concrete blocks

The blocks started making their way out back as the boys dug out the pond a little bit more…

day 3 soil removal

Which means truckloads of soil leaving our yard again…

day 3 haul it away

Can you believe the size of this thing?!

day 3 man that’s deep!

The finished pond will only be 2′ deep, so my luxurious giant pool is really just a pipedream…

day 3 giant pit

Giant pit, however — we got that. Yup.

————————

Day 2

Day 1

patios: day 2

Thursday, December 2nd, 2010

As I write this, the rain is blowing past the windows. Sideways. At about 50 mph. Luckily the Land Design Associates crew nailed everything to the ground. Including our cat — where is she? The boys got a lot done before the rain that arrived. Let’s see…

The 5′ long x 18″ wide x 7″ tall granite pieces arrived for the back step…

day 2 stone steps arrive

Cement blocks were trimmed to create a foundation for the granite steps…

day 2 cutting concrete blocks

Then they got set in place and filled with crushed stone…

day 2 step base

The pond got dug out a little bit more….

day 2 the trench

If you look closer, you can see where the rainwater collection tank’s overflow pipe got cut…

day 2 broken drainpipe

Oopsie. S’okay. We knew that might happen, seeing as its placement runs right below the pond area…

rain collection diagram

Luckily it’s an easy fix. Not a problem.

Meanwhile, more patio base material arrived…

day 2 more crushed stone

And the crew turned on the heavy machinery again to start excavating the lower patio…

day 2 lower patio

They got it level and tamped it all down right before the skies let loose…

day 2 tamping lower patio

And then Mother Nature told everyone to go home. Except us. We were already there.

day 2 Bambino, there you are!

Found the cat.

————————

Day 1

patios: day 1

Wednesday, December 1st, 2010

And so the transformation begins! Monday afternoon, Jim and Connor came and marked out the site with their laser level…

marking out the site

all marked out

And then it was Tuesday! The day I had to do some letting go. Had to look away as the Land Design Associates crew dug up my Beni Kaze forest grass so it wouldn’t get crushed. Then they leveled a good portion of my carefully prepared bed. Funny how prep takes you days and days of manual rock removal and shoveling in compost, and yet how immediately it all comes undone…

day 1 destroying my bed, it’ll all be okay

*sigh*  The steel steps had to come out, too. Once that was done, they were able to get the machines up the hill and into the yard…

day 1 up the hill

Gravel was moved out…

day 1 removing gravel

So the digging could begin…

day 1 digging begins

Is it a pond?

day 1 is it a pond?

Or a lap lane?

day 1 or a lap lane?

As you can see, the patio area got leveled,  geotextile reinforcement put down and crushed run and sand tamped down over top in preparation for the stone pavers. All in one day!

These guys aren’t messing around.

and the winner is…

Tuesday, November 30th, 2010

As promised in yesterday’s post, today I reveal our patio layout choice. WHOOP-DEE-DOO! Can I get a whuh-whuh… and a drumroll?

THE ISLAND OF PATIO, slightly revised

the winner!

There’s a lot to love about this design. Lots of pond — more than I envisioned, actually. And the city says we can go 2′ deep without having to fence the yard, so that was a pleasant surprise. We were originally told 12″. Whew! In the upper righthand corner of the patio, you can see a long inset. That’s going to be a planting area cut into the stone where I can tuck something vertical but not too tall. Maybe equisetum hymale (horsetail), like this…

equisetum hymale | silive.com: “Tiny patios are big on setting the mood”

equisetum hymale | silive.com: “Tiny patios are big on setting the mood”

Or maybe a short running bamboo, like this eye-catching Pleioblastus Auricomus?

pleioblastus auricomus | alpinegardensociety.net: “A Northumberland Alpine Gardener's Diary”

pleioblastus auricomus | alpinegardensociety.net: “A Northumberland Alpine Gardener's Diary”

Both equisetum and bamboo require a containment barrier — 2′ deep, minimum. No matter what ends up here, I think it’s smart to protect our patio investment. Having to pull plants out from in between the pavers would be a nightmare!

The Land Design Associates crew just arrived and digging begins today. You ready? I’m ready!