Posts Tagged ‘built-ins’

an idea starts to come together

Friday, January 18th, 2013

It’s been a while since we went to the bathroom together. David and Joe have been making progress on the built-ins in there, so maybe it’s time for a peek — even if it’s not quite done yet.

Let’s start at the beginning. A couple of years ago, I handed David a rudimentary scribble of what I pictured for our new bathroom vanity…

my first sink scribble

 

 

 

 

 

 

 

 

 

 

 

David drew it mo betta with measurements — I know I’ve shown you this before. This includes the shelf/bench and wall of walnut (to the right of the sink) that I was also hoping for…

layout of sink area

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drawing is SO much easier than building. Here comes the hard part.

First, there was figuring out the complex, irregular curves of an imperfect  sink — not as right-angled as woodworker might hope — in order to get the wood to mate up with it…

figuring out the curves

 

Required some math but they figured it out, as I trusted they would. So they continued on to constructing the vanity box…

building the vanity box

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The open end will face the toilet. That’s where the toilet paper and the occasional book or magazine will hide to keep things from getting messy.

Once that was done, they propped the vanity up on sawhorses and made sure it fit the space as intended with the sink and the faucet roughly in place…

testing the sink on the vanity

 

There was the tricky veneering stage…

veneering the vanity

 

 

 

 

 

 

 

 

 

 

 

And then they secured to the wall and made the necessary tweaks…

making adjustments

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

They stained it in place. Here it is with two coats — it still has to be made waterproof (that’s another story)…

hanging the box on the wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Just to the right of the sink is the walnut panel that will eventually have three hooks on it for hanging up clothes…

walnut panel installed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The bench/shelf that extends from below the sink still needs to be built. But isn’t that gorgeous?!

In that same corner there’s now the built-in linen cabinet that David began last June. Just look at that walnut! Love love love.  Just needs a little tweak on that bottom drawer and it’s good to go…

walnut storage wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Love how the minimal fingerpulls worked out. Perfect…

fingerpulls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inside, there’s plenty of room for towels and any bathroom paraphernalia…

a look at the shelves

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

There’s even a recharging station for an electric shaver! So spoiled…

recharging station

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The drawers are nice and deep…

nice deep drawers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes, the back of the cabinet and the drawers are angled to accommodate our angled wall. This should give you a better idea of the wall when you look at the other side. See how the lights are on angle, too?

record storage wall and hallway

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Btw, that’s the record storage wall, in progress. More on that another time.

So, back to the bathroom. Here you can begin to get an idea of how the walnut built-ins will look together — in an outage. I need light!

walnut corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Argh. So impossible to take decent pictures in this tiny bathroom — especially when the lighting isn’t done yet. Oh well.

Before I go, take a peek at the fantastic custom pocket door David and Joe designed, built and installed…

custom walnut pocket door

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A better look at the door project next week. That’s it for now.

 

projects update: built-ins + butterflies

Thursday, August 2nd, 2012

Let’s see… when we left off on Day 9, it was almost time for our monarch butterfly to bust out of her chrysalis, fan us with her awe-inspiring wings and flutter on out of here. So what’s up?

DAY 10

monarch pupa: day 10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DAY 11

monarch pupa: day 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DAY 12

monarch pupa: day 12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

So much for the 10-day cycle. Ever waited for a cat to have kittens? It’s kind of like that. I go outside and check the chrysalis throughout the day. When something happens I’ll let you know.

In other news that might actually be news, David and Joe are downstairs banging out the built-ins. Here’s your sneak-peek…

built-ins: joe and david at work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

built-in: record rack

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

built-ins: bookcases and whatnot

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Once they’re in, David can tell you all about them. Also waiting in the wings: our murphy bed hardware. So there’s that to look forward to, as well.

One last note: the wallpaper decision has been made. I’m saving it as a surprise. All will be revealed with the fullness of time.

 

scenes from the woodshop

Tuesday, June 26th, 2012

I met up with David at Tim’s graciously provided woodshop yesterday to figure out the size and location of fingerpulls for the bathroom cabinet doors and drawer fronts. It’s a small detail but one we want to repeat on built-ins that will go upstairs as well.

We explored several design options (you can see a few on my no-hardware cabs Pinterest page, if you like) and settled on a slim rectangular notch. David mocked them up in paper…

fingerpulls laid out on the cabinet doors and drawer fronts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimal. Nothing to jut out into the small space. Echoes the slim rectangular tiles in the bathroom. So there you go, one more decision down.

In other news, David and Joe started setting up the scaffolding in anticipation of rebuilding the deck…

david and joe about to set up the scaffolding

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The deck rebuild has been on hold since March. Excitement ensues.

scenes from the woodshop

Tuesday, June 19th, 2012

David says the bathroom cabinet has been drilled for future usefulness…

cabinet being drilled for shelf holes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The man himself explains:
“Those wacky Europeans, they came up with this 32mm system. A series of 5mm holes are drilled 32mm apart a set distance from the front edge of the sides of the cabinet. A parallel row is drilled some multiple of 32mm back from the first row at the back of the cabinet. The holes can be used for door hinges, drawer slides or shelf pins. An ingenious way to make easily customizable cabinetry!”

cabinet drilled for shelves

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

That is all.

scenes from the woodshop

Wednesday, June 13th, 2012

David reports in again from Tim’s remote Smithfield woodshop with visual proof of progress. Right now, it’s all about edge taping the walnut cabinet parts.

First, he rigged up an edge-taping management system…

David’s DIY edge tape dispenser

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Then he whipped up a way to hold the cab parts steady…

let the edge taping begin!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Then he applied heat…

and the edge tape goes on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Trimmed off the excess…

trim off the excess

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

And VIOLA! Edge taped.

finished panel edges

 

 

 

 

 

 

 

 

 

scenes from the woodshop

Thursday, June 7th, 2012

David sends us progress updates from Tim’s woodshop.

The walnut, cut and labeled…

scenes from the woodshop: walnut cut and pieces labeled

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pieces selected for the office area built-ins…

scenes from the woodshop: for the office area built-ins

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

And pieces for the bathroom cabinet…

scenes from the woodshop: for the bathroom cabinet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

More news as it comes in!

making sawdust

Wednesday, June 6th, 2012

walnut plywood

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The walnut has arrived for the built-ins in the bathroom.

And now David gets to put his mad woodworking skillz to work…

the cutting has begun

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stay tuned. Thanks, Tim, for the use of your woodshop!