mon progress report

No futzing around here, no sir. Things are moving along nicely downstairs. Let’s see, we left off the other day with new beam #1 in position just below its ultimate destination. It is now installed (support walls are still in place)…

mpr10

 

After that, beam #2 was constructed from three beefy LVLs…

mpr2

David cut up and pulled out the old beam…

mpr3

Which then left cutting through the old joists and removing the nails…

mpr4

Until there was a clear pocket for the new beam to go into…

mpr5

Joe and David hefted the new beam into place…

mpr6

And there it is! New joist hangers in, all clean and shiny…

mpr9

Meanwhile, the concrete for the new footing hardened up as it should, so it was time to put in the new column that supports quite a bit of the house…

mpr8

At the bottom, it will get bolted to the steel plate that’s set into the concrete. And at the top, metal plates will soon join the three beams to the new column…

mpr11

Stay tuned.

3 Responses to “mon progress report”

  1. […] we left off last week, the new column went in downstairs. Since then, David bolted the column to the metal bracket that was cast into the newly […]

  2. […] up against it? Can I just quickly remind you that this was the spot where the new concrete and new column went in last […]

  3. […] pair of LVL beams (same as we used to support the living room floor/downstairs ceiling) will carry the deck load across the front of the […]

Leave a Reply